First floor pipes and sockets in place
Sun, 6 Jul 2025 12:10:00 UTC

During June the pipe for electrics and water were installed.
A week after the contruction crew was back.
I have posted seven pictures the last couple of weeks updates.
At the time of writing the construction is about to get back into full scale :-D

Earlier this year the line up of the kitchen, bathroom specifics and waterboiler placement was agreed.
The next steps will be to choose the floor, bathroom and kitchen tiles.

In the attic I have introduced a portable A/C unit.