First floor apartment completed
Fri, 14 Nov 2025 16:00:00 UTC

Another milestone reached this week as the first floor completes.

Although I am still missing the showever screen in the biggest bathroom - I decided to declare victory and start preperations to move in to the new apartment.
Since my last post the following has happend:


The boiler came up and we realized that there was an overrun vent, that needed tubing going into the drain under the sink. A small setback as they would open the wall to install the pipe for the tube to run in.
All interior and all exterior doors and window were installed on Nov 5th.
On Nov 7th the missing floor tiles came down and one wall tile in the bathroom had to be remounted (a powerplug was behind the vanity mirror).




One more news item from Nov. 6th: Despite not having the complete funding in place I accepted the offered quotes form both the backyard and the groundfloor apartment - effectively ordering the completion of the house reconstruction.

The MP4 below is a walkthrough from yesterday and will be the last before I move into the apartment.