Installments in the courtyard
Sun, 16 Aug 2026 09:31:00 UTC

Lots of new installments in the courtyard this week. I have had a vacation week and have been trying to make sure artifacts was available for the team to install, as there is a lot of waiting time right now.

The artifacts include the new courtyard lamps, that ended up being an Ikea lamp, as I could not find a porcelain lamp that I liked.
Instead of going for what i wnated I went for something simple and that could be made avialbe to the team quickly, because they are just better and faster than me to put them up. I basically have to take advantage of any time gaps in their work schedule..

Another installment started was the waterheater for the groundfloor that sits on the wall next to the courtyard kitchen.
I bought the same type as for the first and secondfloor, because - one - I have been happy with the function, the brand, make and model - and secondly I have one smartphone app to controll all water heating in the house that fits all appliances.

Another major installment from this week is exterior doors and windows on the groundfloor. The doors and windows are made of aluminum and are simple in construction. The team did a really nice job of getting the doors to fit smoothly with the interior and exterior floor, to ease accessabilty. Disabled people will have a much easier time getting in and out of the courtyard, as the doors are almost flush with the floor.

Last installment mention is that we started putting up interior wall lamps on Friday. The lamps are the same classic plaster lamps that was choosen for the second floor.